Before the crusher can be installed, it must be fully debugged. This will ensure that the equipment is operating properly.

Installation:

1. All fasteners must be secured during installation and during the test run of the unit with vibratory operation by the electric crusher pump. They should also be regularly inspected during production and operation and should be fastened whenever necessary.

2. Pay attention to the direction in which counter-breaking rotation is made during installation (the pulley will indicate the direction of the arrow). This direction cannot be reversed.

3. The motor should be fitted with a cover to protect the transmission belt, according to the installation conditions.

4. You should adjust the gap between the counterattack plates and the blowbar according to your work requirements. To verify that there are no impacts, turn the rotor several more times. To prevent vibration from causing the nut to loosen and fall, it is important that the sleeve nuts are securely fastened after adjustment. This will prevent the nut slipping and colliding with hammer, resulting in an accident.

Debugging

1. Before leaving the factory, the rotor passed the balance test. The balance test is not necessary again. The balance configuration must be checked when replacing the hammer head or rotor components.

2. Installing the main engine must be balanced. The main shaft's level error should not exceed 1 mm/m. Main and driven wheels should be on the same plane. Fix the motor by tightening the belt.

3. Verify that each component has been properly installed.

4. Verify the wiring and fastening, adjust the overload protector and time delay relay, connect the circuit and test the motor rotation. Finally, select the appropriate fuse.

5. Verify that the hydraulic system is operating reliably. Also, check for leakage.

6. Move any foreign objects from the crusher and inspect for friction and collision.

It is important to pay attention to the installation and debugging issues that crushers should be aware of. This will ensure smooth operation and a better overall experience for the entire equipment. .

评论

发表评论

此博客中的热门博文

BTMA--Development History of Henan Benteng Machinery Equipment Co., Ltd.

  Henan Benteng Machinery Co., Ltd. is a well-known manufacturer and joint-stock enterprise with import and export rights. It mainly produces large and medium-sized mining machinery and other equipment. Our fixed assets are RMB 80,000,000, we have four subsidiaries and one R&D department. Product quality is the life of our company, and all our products have passed the ISO9001: 2000 quality system certification. In addition, high-quality after-sales service continues to ensure high quality.  In addition, we have a group of experienced and excellent after-sales service personnel to provide tracking services to customers around the world. The needs of customers are what we strive to create. Customer satisfaction is what we are after. For decades, Benteng people have continued to create, surpass themselves, and adhere to the concept of "development is the last word". Develop brand with quality. Enhance the brand with service. We Benteng people are determined to forge ahead

BTMA-The necessary conditions to ensure the operation of the crusher

People in the industry are very aware that crushers often work under heavy load conditions and in harsh dusty environments. In order to ensure the performance and reliability of the crusher during operation, each type of crusher must meet the following requirements:   1. The transmission device of the crusher , the feeding port and the discharging port must have protective devices 2. The crusher must have a reliable dustproof device and dust removal device 3. Ballast breaking machines should be equipped with simple and safe safety devices 4. The structure of the crusher should ensure that all its worn parts, especially the crushing parts, can be replaced quickly and easily. The number of these parts should be kept small, the weight of each part should not be too large, and the shape should be as easy as possible for manufacturing and maintenance.

BTMA--Analysis and research on the crushing mode of the crusher

Although the crusher is a practical machine, thinking about its crushing method is still very valuable. Based on years of working experience, the author summarizes as follows: 1. Crushing: The ore is placed between two crushing surfaces, and after pressure is applied, the ore is crushed due to the compressive stress reaching the limit of its compressive strength. 2. Splitting ballast: When squeezing the ore with a flat surface and a working surface with a sharp shuttle, the ore will split along the direction of the pressure line of action. The cause of splitting is due to the tensile stress on the splitting plane reaching or exceeding the tensile strength limit of the ore. The tensile strength limit of ore is much smaller than the compressive strength limit. 3. Fracture: The ore is damaged by bending. The crushed ore is a beam with two or more fulcrums bearing concentrated loads. When the bending stress in the ore reaches the bending strength limit of the ore, the ore is broken. 4.